|
A Communication and Skill Building Activity |
Topic:
Type of Web
activity:
Materials /
Software needed:
Materials for construction (listed below).
Grade
Level:
Time
involved:
Created
on:
The Web Science Workshop lessons were created in cooperation with the Exploratorium Teacher Institute .
This site
developed and maintained by
Deborah
Hunt
and
Eric
Muller
.
3601 Lyon
St.
©2000 The Exploratorium |
|
Your assignment: A vehicle must be designed and built to carry a load across a 40-centimeter-wide chasm (Two tables separated by 40 centimeters). A bridge must be designed and built to support the vehicle. Both the design and building of the vehicle and bridge must be done as a team effort (four people per team). However, the bridge builders (two people) and the vehicle makers (two people) will be in separate groups and in separate locations. These two pairs will not meet until it is time to make the final crossing. All communication between these two groups must be conducted on the Web, in a Web chatroom (i.e. Yahoo chat ), through email or teleconferencing. You may solve this problem any way you can as long as you follow the rules below. Grades and winners will be determined by design, originality, and weight ratio. The weight ratio will be determined by the weight of the load carried across the bridge / weight of the bridge + weight of the vehicle. This means, you want to construct the lightest vehicle and bridge possible that can carry a heavy load. Here are the rules:
Materials:
The tables that will be used will be at least 1 meter wide by 2 meters long. The table tops will be 3 to 4 centimeters thick. Both groups are limited to and will have access to the following materials:
|